top of page

let's go shopping!

shopping cart.png

Our shipping container is loaded with these two buildings (believe it or not) and ready to ship.  While it's on its way, we'll be putting down forms and pouring foundations and floors.  Can you help us at the checkout counter?

register.png
Shipping Container
to Haiti
Loaded with the
two buildings above (believe it or not!)
PEACE container copy.png
Shipping Container
to Haiti

This is a great place to tell people more about your special day and get them excited to celebrate.

More Info >

2,000 miles/Greenbrier,Arkansas to

Port au Prince

$3.11 per mile

$10 pays for 3 miles!

$6000 total

steel in container 1.png
45x45 schematic 2.JPG
classroom bldg.png

classroom building 96'x36'  12 classrooms

multi purpose building 45'x45'x16'

 recreation area, assemblies, 2 or 3 rooms on balcony

moving
container
to site
port au prince port
to carrefour
kafou to pap.png
moving
container
to site

This is a great place to tell people more about your special day and get them excited to celebrate.

More Info >

13 miles from the port to Carrefour

$38 per mile

$40 pays for 1 mile!

$500 total

kafou to pap.png
wood to
frame
concrete
2x4s and 2x6s to make forms for footings, and floors
2x4-constructio.png
wood to
frame
concrete

This is a great place to tell people more about your special day and get them excited to celebrate.

More Info >

A pile of wood!

$1 a board foot

$100 pays for 1/8 of what we'll need!

$760 total

2x4-constructio.png
wire mesh to reinforce
floors
keeps floors from cracking, adds strength during earthquakes
rewire.png

5500 square feet!

wire mesh to reinforce
floors

This is a great place to tell people more about your special day and get them excited to celebrate.

More Info >

5500 square feet!

25 cents a square ft

$10 pays for 40 square feet!

$876 total

rewire.png
concrete
installed
by crew
footings, piers and 
floors
mixer.png

150 cubic yard of concrete

concrete
installed
by crew

This is a great place to tell people more about your special day and get them excited to celebrate.

More Info >

made on site

150 cubic yards

$100 a cubic yard

$3.70 a cubic foot

$15,000 total

mixer.png
rebar for footings
strengthens foundation
138005980-division-rebar-big-size-used-c
rebar for footings

This is a great place to tell people more about your special day and get them excited to celebrate.

More Info >

48 bars

950 feet of rebar

$8 for a 20 foot bar

$450 total

138005980-division-rebar-big-size-used-c
vapor barrier
under concrete
makes concrete stronger over time
plastic.png

6 mil

vapor barrier
under concrete

This is a great place to tell people more about your special day and get them excited to celebrate.

More Info >

5500 square feet!

8 cents a square foot

$10 pays for 125 sq. feet!

$450 total

plastic.png
anchor bolts
bolt steel
to concrete
connects steel posts to the foundation and floor
anchorbolt 2.png
anchor bolts
bolt steel
to concrete
More Info >

$7.65 each

40 needed

$360 total

anchorbolt 2.png
labor:
10 Haitian
workmen
hardworking guys who need work
Vernal.png
labor:
10 Haitian
workmen

This is a great place to tell people more about your special day and get them excited to celebrate.

More Info >

Hard workers!

$2 an hour x 8 hours

10 days

$16 a day per man

$1600 total

Vernal.png
bottom of page